Finally, after a really chitty week at work, spending until 11pm there thursday, friday, and saturday... I was able to take the day off on sunday and get some work done on the garage.

I built the structure/frame for both of the swinging doors. They are REALLY sturdy. So far, I'm definitely happy with my decision to build these myself. The 4x4's on each door will be closest to the hinges, the 2x4's in the center.

The 2x4's on the top and bottom are connected to the vertical boards via 5/16"x3" lag bolts with washers, countersunk. There are 4 going into the top and bottom of the 4x4, 2 going into the top and bottom of the 2x4, and then 2 going into the top and bottom of the 2x4 cross-support board.

Built the first one:



Built the other one:


Looking pretty good:


I have a plan for the cladding front and back, adhesive, insulation, hinges, weather stripping, ground wipers and center flap, as well as the locking/closing mechanism, and an idea for center casters for support to prevent sag. I think this will all take one more full day of work. Then, I will just need to paint them and hang them up!

Really coming together now